MIL-STD-2105D
5.1.1.2.3 Test interruptions. Minimize interruptions of the test. If the test is interrupted by slack labor periods (weekends, holidays), maintain the last test environment encountered prior to the slack period. Extend the test period as necessary to complete at least 20 temperature changes (hot/cold) or 10 full cycles. A full cycle consists of two temperature changes (e.g., hot-to-cold-to-hot).
5.1.1.3 Instrumentation. Continuously monitor and record the temperature and humidity levels of the test chamber.
5.1.1.3.1 Photography. Use still photographs to record the condition of the test item and test setup prior to and after the test (see paragraph 6.2).
5.1.1.3.2 Radiographic Inspection. Conduct a radiographic inspection in accordance with ASTM E-1742 to record the condition of the test item prior to and after the test.
5.1.1.4 Passing criteria. These criteria are based on the final observation.
a. No reaction of the explosive.
b. No exudation containing explosive material.
c. Explosives do not crack or separate in a manner which would create a hazardous condition.
d. All safety devices remain in the safe position or safe condition.
e. The structural integrity of the item is not compromised by corrosion, loosening of joints, or other physical distortions.
5.1.1.5 Documentation. Develop a data sheet documenting the test results (see paragraph 6.2).
5.1.2 Vibration test.
5.1.2.1 Description of test. The vibration test consists of exposing the test item to the most intense vibration environment that it will encounter during the life cycle as
16
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business